苏州实操派科技有限公司官网-实操派教育科技,汇川技术PLC培训,实操派PLC培训,苏州PLC培训机构

首页国外自动化施耐德变频器ATV61&71 CC-Link card VW3A3317-EN(2007.06-aav49429)
MENGMINGMIN

文档

1817

关注

0

好评

0
PDF

ATV61&71 CC-Link card VW3A3317-EN(2007.06-aav49429)

阅读 245 下载 128 大小 1.03M 总页数 39 页 2026-01-09 分享
价格:¥ 1.00
下载文档
/ 39
全屏查看
ATV61&71 CC-Link card VW3A3317-EN(2007.06-aav49429)
还有 39 页未读 ,您可以 继续阅读 或 下载文档
1、本文档共计 39 页,下载后文档不带水印,支持完整阅读内容或进行编辑。
2、当您付费下载文档后,您只拥有了使用权限,并不意味着购买了版权,文档只能用于自身使用,不得用于其他商业用途(如 [转卖]进行直接盈利或[编辑后售卖]进行间接盈利)。
3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。
4、如文档内容存在违规,或者侵犯商业秘密、侵犯著作权等,请点击“违规举报”。 免责声明: 版权:我们作为资源的整理方,所有资源均来自互联网的优秀作者们,版权归原作者或企业所有。
申明:任何使用本站收集的资源产生的不测后果,本站不对此负任何责任。
1.Important InformationNOTICERead these instructions carefully,and look at the equipment to bee familiar with the device before trying to install,operate,or maintainit.The following special messages may appear throughout this documentation or on the equipment to wam of potential hazards or to callattention to information that clarifies or simplifies a procedure.The addition of this symbol to a Danger or Warning safety label indicates that an electrical hazard exists,which will resultin personnal injury if the instruction are not followed.This is the safety alert symbol.It is used to alert you to potential personal injury hazards.Obey all safety messages that follow thissymbol to avoid possible injury or death.A DANGERDANGER indicates an imminently hazardous situation,which,if not avoided,will resu lt in death,serious injury,orequipment damage.A WARNINGWarning indicates a potentially hazardous situation,which,if not avoided,can result in death,serious injury,orequipment damage.A CAUTIONCAUTION indicates a potentially hazardous situation,which,if not avoided,can result in injury or equipmentdamage.PLEASE NOTEElectrical equipment should be serviced only by qualified personnel.No responsibility is assumed by Schneider Electric for anyconsequences arising out of the use of this material.This document is not intended as an instruction manual for untrained persons.2006 Schneider Electric.All Rights Reserved.2.Before you beginRead and understand these instructions before performing any procedure with this drive.A DANGERHAZARDOUS VOLTAGERead and understand the Installation Manual before installing or operating the Altivar 61/71 drive.Installation,adjustment,repair,and maintenance must be performed by qualified personnel.The user is responsible for pliance with all intemational and national electrical standards in force concerningprotective grounding of all equipment.Many parts of this variable speed drive,including the printed circuit cards,operate at the line voltage.DO NOT TOUCH.Use only electrically insulated tools.DO NOT touch unshielded ponents or terminal strip screw connections with voltage present.DO NOT short across terminals PA and PC or across the DC bus capacitors.Install and close all the covers before applying poweror starting and stopping the drive.Before servicing the variable speed driveDisconnect all power.Place a "DO NOT TURN ON"label on the variable speed drive disconnect.Lock the disconnect in the open position.Disconnect all power including external control power that may be present before servicing the drive.WAIT 15MINUTES to allow the DC bus capacitors to discharge.Then follow the DC bus voltage measurement procedure givenin the Installation Manual to verify that the DC voltage is less than 45 VDC.The drive LEDs are not accurate indicatorsof the absence of DC bus voltage.Electric shock will result in death or serious injury.CAUTIONDAMAGED EQUIPMENTDo not install or operate any drive that appears damaged.Failure to follow this instruction can result in equipment damage.53.IntroductionThank you for purchasing the CC-Link option card (VW3A3317)for Altivar 71 and Altivar 61.IMPORTANT This munication option card is fully supported with the version V1.4 and above of the Altivar 61 firmware.This munication option card is only supported with the version V1.6 and above of the Altivar 71 firmware.Specific versions of theAltivar 71 firmware are not supported.For older versions,the option will operate normally,the only restriction consists on the address and in the baud rate infomation:theseparameters are not displayed in the munication menu.These parameters are read only(defined by DIP-switches).By Installing this board'into the Altivar 61,data munication can be made with CC-Link V1.4 master controller(PLC..).The munication card has a connector for connection to the work.Data exchanges give access to all Altivar 61/71 functions:Control (start,stop,reset,setpoint),Monitoring (status,current,voltage,thermal state...),Diagnostics (alarms).The graphic display teminal or the integrated display terminal can be used to access numerous functions for munication configurationand diagnostics.4.Documentation structure■cc-Link manualThe present CC-Link user manual describes:connection to CC-Link,configuration of the munication-specific parameters via the integrated HMI or the graphic HMI,·diagnostics,·works variables.You will also find important information in other Altivar 61/71 technical documents.They are available on the Web sitewww.telemecanique. and on the CDROM delivered with each drive.■Installation manualThe installation manual describes:how to assemble the drive (particularly how to mount the CC-Link card),how to connect the drive.■Programming manualThe programming manual describes:the functions and parameters of the drive.how to use the drive HMI (integrated HMI and graphic HMI).Communication parameters manualThe Communication parameters manual describes:the interaction between munication and local control (HMI and terminals),the drive parameters with specific information for use via a munication work(addresses,formats,etc).When using the CC-Link card,some sections of the Communication parameters manual are not relevantprofiles,1/O profileDSP 402 profile.The description of drive parameters is useful only if you use the parameters access function of the CC-Link card.75.NotationDrive terminal displaysThe graphic display terminal menus are shown in square brackets.Example:[1.9 COMMUNICATION].The integrated 7-segment display terminal menus are shown in round brackets with a""at the end.Example:(Cn-).Parameter names displayed on the graphic display terminal are written in square brackets.Example:[Fallback speed]Parameter codes displayed on the integrated 7-segment display terminal are written in round brackets.Example:(L FF).■FormatsHexadecimal values are written as follows:16#or 0xBinary values are written as follows:2#■AbbreviationsO=OptionalM=Mandatory6.Hardware setup6.1.ReceiptCheck that the card reference printed on the label is the same as that on the delivery note corresponding to the purchase order.Remove the option card from its packaging and check that it has not been damaged in transit.6.2.Mounting the option card on the driveCC-link cards positionThe CC-link option card must be mounted in the top position when used with another option card.6.3.Hardware descriptionPanel mounting tabsConnector to the driveCC-Link LED indicatorSW4 (reserved)-Earth PlateBaud RateSelector(SW1)CC-Link Connector(TB1)Station Number(SW2,3)Upper 110 ohmMiddle:NothingUnder 130 ohm■ImportantSW4 and RJ-45 connector are reserved for Schneider internal use onlySW4 Right position Normal operationSW4:Left position Forbidden use6.Hardware setup6.4.Set the station number and baud rateFor the setting station number or munication speed to take effect,power needs to be tumed off and then turned back on.909090tBAUD RATE·Set the Station No.The station number can be set between 1 and 64.The switch x10 is set up the ten's place and x1 is set up the ones.Set the arrow (t)of the corresponding switch to the required number.Set the transmission speed.(For details,refer to the CC-Link master unit manual.)Setting Switch01Transmission Speed156 kbps625 kbps2.5 Mbps5 Mbps10 MbpsIt causes an error when the switches are not set correct position (ex.set position between 0 and 1 switch label),set over 5.107.Connecting to the bus7.1.Cable routing practicesWhen wiring Altivar 61/71 drives to a CC-Link work,follow all wiring practices required by national and local electrical codes.Alsoobserve the following guidelines:Avoid areas of high temperature,moisture,vibration,or other mechanical stress.Secure the cable where necessary to prevent its weight and the weight of other cables from pulling or twisting the cable.Use cable ducts,raceways,or other structures to protect the cable.Use these structures for signal wiring paths.They must not containpower wiring.Avoid sources of electrical interference that can induce noise into the cable.Use the maximum practicable separation from such sourcesWhen planning cable routing within a building,follow these guide lines:Maintain a minimum separation of 1 m from the following equipment:air conditioners and large blowers,elevators and escalators,radios and televisions,inter and security systems,fluorescent,incandescent,and neon lighting fixtures.Maintain a minimum separation of 3 m from the following equipment:line and motor power wiring.·generators,alternators.When wiring in electrical equipment rooms or large electrical equipment line-ups,observe the following guidelines for cable segregationand separation of circuits:Use metallic conduit for drive wiring.Do not run control work and power wiring in the same conduit.Separate non-metallic conduits or cable trays used to camy power wiring from metallic conduit camrying low-level control work wiringby at least 300 mm.Separate metallic conduits camying power wiring or low-level control work wiring by at least 80 mm.Cross the metallic conduits and non-metallic conduits at right angles whenever power and control work wiring crossAttenuate conducted emissions from the drive to the line in some installations to prevent interference with telemunication,radio,andsensitive electronic equipment.Such instances may require attenuating filters.Consult the Altivar catalog for selection and application ofthese filters.7.2.Card connector pinoutBelow figure is the temminal to connect the CC-Link cable.Connection is screw connection.The terminal is a plug-type and the signal ofeach teminal is as follows.SymbolSignal contentsFGFram groundSLDShieldDGSignal groundDBCommunication data-DACommunication data8.Connection of Several DrivesFactory Automation can be applied with several drives which share CC-Link system as a remote device station,and are controlled andmonitored by PLC user programs.Communication terminal DA.DBSet up the work using shielded twisted pair cable.Communication terminal DGPlease connect the shield line of the dedicated CC-Link cable with the SLD teminalConnection of the frame ground terminal FGGrounding resistance is 100 ohm max.Line adaptation:the termination resistor is located on the munication card.the 3 position SW6 switch activate or not line adaptation:SW6 up 110 Ohms temmination resistor activated.SW6 down 130 Ohms termination resistor activatedMaster unitDriveDriveDADADADBDBDBDGDGDGSLDCC-Link dedicatedSLDCC-Link dedicatedSLDcablecableFGFGFGGround (100 ohm or less)SW6 upSW6:middleSW6 upMaximum number of units connected to one master station is 42 units (when only drives are connected).If any other units are indluded,the number of occupied station on the unit.So the connectable number of units is different.
文档评分
    请如实的对该文档进行评分
  • 0
发表评论

"π³ 实操派",培养中高端PLC工程师,PLC培训-Codesys培训

项目实战 手把手教学 微信&电话 15850116008
超2000节系统化课程,汇川优秀自动化讲师亲授!学一门Codesys,玩800家PLC仅剩少量名额
点击免费试听

到实操派,学PLC就是快!

扫码领取工控文库VIP

钻石VIP先到先得

服务电话 & 微信:9:00-22:00

15850116008

苏州实操派科技有限公司

公司地址:江苏省苏州市吴中区越溪街道天鹅荡路5号31B13

Copyright © 苏州实操派科技有限公司 2022 到实操派,学PLC就是快!工业自动化业务培训适用人群:成人 ( 苏ICP备2022021576号-3 )

公司地址:江苏省苏州市吴中区越溪街道天鹅荡路5号31B13

返回顶部