苏州实操派科技有限公司官网-实操派教育科技,汇川技术PLC培训,实操派PLC培训,苏州PLC培训机构

首页国产自动化国产其他研控EC20 Basic Module Quick Start Manual _V1.1_
zy8122338

文档

139

关注

1

好评

0
PDF

EC20 Basic Module Quick Start Manual _V1.1_

阅读 437 下载 197 大小 530.45K 总页数 40 页 2024-10-02 分享
价格:免费文档
下载文档
/ 40
全屏查看
EC20 Basic Module Quick Start Manual _V1.1_
还有 40 页未读 ,您可以 继续阅读 或 下载文档
1、本文档共计 40 页,下载后文档不带水印,支持完整阅读内容或进行编辑。
2、当您付费下载文档后,您只拥有了使用权限,并不意味着购买了版权,文档只能用于自身使用,不得用于其他商业用途(如 [转卖]进行直接盈利或[编辑后售卖]进行间接盈利)。
3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。
4、如文档内容存在违规,或者侵犯商业秘密、侵犯著作权等,请点击“违规举报”。 免责声明: 版权:我们作为资源的整理方,所有资源均来自互联网的优秀作者们,版权归原作者或企业所有。
申明:任何使用本站收集的资源产生的不测后果,本站不对此负任何责任。
1OutlineThe outline of the basic module is shown in Figure 1 (With theexample of EC20-3232BRA)Figure 1 Structure of the basic moduleThe name and function of the ponents in the figure are as follows:1.The installation position of a button cell battery (CR2032 lithiumbattery)for data backup.2.Power supply input ports3.Signal input ports4.Input signal status LEDs5.26pin bus bar socket,used for connecting the extension module6.Output signal status LEDs7.Fix screws,used for tightening the top/bottom cover of the PLC8.Mounting holes,used for installing screws10.Signal output ports11.System operation status LEDs12.Communication port COM1,providing RS485 and RS232 at the1same time13.Communication port COMO,RS232,Mini DIN8 socket14.System operation control switch,with three positions:ON,TMand OFF.Note:"EC20-4040BRA and EC20-4040BTA are installed by M4screws.2 Intallation2.1 Installation PositionThe PLC must be applied in the environments meeting with standardll installation ambient,and Class 2 pollution.Mount them up anddown on the backboard of the cabi horizontally.You must providea clearance of at least 15cm,both above and blow the units,forpropel cooling.Never mount them to the floor or ceiling of anenclosure or other directions,as shown in Figure 2.No heatgenerating equipment should exist around the PLC2.2 Installation MethodGenerally you can mount the PLC onto a standard rail (DIN)with35mm width.Follow these steps:1.Fix the DIN rail to the backboard.2.Pull out the clip located on the bottom of the PLC and hook theback of the PLC onto the rail.3.Snap the clip closed,carefully checking to ensure that the clip hasfastened the PLC securely onto the rail.4.At last,install two DIN rail stops at the two sides of the PLC toavoid slippage around.3Other EC20 series modules can be mounted using the sameprocedures.dp cUnder the conditions with great impact,you should mount the PLC ona panel using the screw installation.Using four M3 fix screws throughthe four mounting holes on the enclosure of the PLC (whileEC20-2012BR/BT has only two holes)to fix the PLC on the backpanel of the electric cabi,as shown in the Figure 4.◆4 mounting holesM3 fix screwFigure 4 Installing a PLC onto a panel with fix screw2.3 Installation Dimensions1.The dimensions for the outline and mounting holes ofEC20-2012BR and EC20-2012BT are shown in the Figure 5.(35mm)%2EC20-2012BR and EC20-2012BT2.The dimensions for the outline and mounting holes ofEC20-3232BRA and EC20-3232BTA are shown in the Figure 6.应217-27EC20-3232BRA and EC20-3232BTA3.The dimensions for the outline and mounting holes ofEC20-4040BRA and EC20-4040BTA are shown in the Figure 7.5Figure 7 Dimensions of outline and mounting holes ofEC20-4040BRA and EC20-4040BTA3 SpecificationsA15mA1000mA650mA600Modelprovided'70mA460m4EC20-20128TA600m4650m4410m4EC2032328TA350m40650m4240m4300m4350m4EC20-40408TA120m40280m4320m4
文档评分
    请如实的对该文档进行评分
  • 0
发表评论

"π³ 实操派",培养中高端PLC工程师,PLC培训-Codesys培训

项目实战 手把手教学 微信&电话 15850116008
超2000节系统化课程,汇川优秀自动化讲师亲授!学一门Codesys,玩800家PLC仅剩少量名额
点击免费试听

到实操派,学PLC就是快!

扫码领取工控文库VIP

钻石VIP先到先得

服务电话 & 微信:9:00-22:00

15850116008

苏州实操派科技有限公司

公司地址:江苏省苏州市吴中区越溪街道天鹅荡路5号31B13

Copyright © 苏州实操派科技有限公司 2022 到实操派,学PLC就是快!工业自动化业务培训适用人群:成人 ( 苏ICP备2022021576号-3 )

公司地址:江苏省苏州市吴中区越溪街道天鹅荡路5号31B13

返回顶部